Our area of expertise lies within the Public and Private Hospital sector having completed Projects of a complex and intricate nature.
We have undertaken and completed projects within University Hospital Galway, Merlin Park University Hospital, Bon Secours Hospital Galway, The Galway Clinic, St Brigid’s Hospital Ballinasloe, Portiuncla Hospital, Mayo University Hospital, Sacred Heart Hospital Castlebar, Roscommon University Hospital, Connolly Hospital Dublin, Beacon Hospital Dublin, Mater Hosptial Dublin, Temple St Hospital Dublin, Mid Western Hospital Ennis, and Belmullet Community Hospital.
Carey’s undertook the €multi-million Project of constructing the New Laboratory at The Coombe Hospital as well as Renovations to the existing Labs. This project involved: a new 4-storey development (1340m2) comprising a steel frame structure formed off a piled foundation and insulated structural slab. Installation of a steel frame system between primary structural elements as…
Details
Carey’s were selected to carry out the works to construct a 169m2 single storey Public Health Microbiology laboratory facility to accommodate the diagnostic services of the Department of Medical Microbiology on the live acute campus of University Hospital Galway. The Project was valued at seven figures. Features of the Project: The building was constructed with…
Details
The Tender was for the construction of a single storey building valued at seven figures, adjacent to the new Outpatients Department that was already under construction by Carey. The new CF building was located directly opposite the existing facility that remained fully operational for the duration of the project. The work involved: 314.7m2 new-build with…
Details
The Grove project consisted of part-demolition, refurbishment and remodelling of the old Grove Hospital along with new extensions and site works. The site in Tuam, originally an 18th century House, was used as a private hospital under the Bons Secours Order of nuns from 1944 until its closure in 2001 and prior to this was…
Details
Located within the existing acute hospital campus at Merlin Park University Hospital Galway, Carey was awarded the project valued in the upper range of seven figures, that comprised the development of the greenfield site to form an extension to the existing hospital to provide two new orthopaedic theatres, recovery bays and support accommodation linked back…
Details
Carey’s was awarded the 2-phase, seven-figure Tender to, firstly, construct a new build extension and, secondly, refurbish existing wards at the National Maternity Hospital in Dublin. The works involved: A 3-storey steel framed extension integrated to the existing, operational labour delivery unit at the second floor level. Constructing a new stair core. Provision of a…
Details
This project entailed the strip out of the Coronary Care Unit in UHG and re-planning in order to provide two Cardiac Catheter laboratory suites for use as a Cardiothoracic Ward. This included all enabling and associated works. It included the maintenance of existing live services, the strip out, demolition and alteration works at the beginning…
Details
We were successful in our Tender for the project in Temple St Hospital which includes a Bridge Link extension and refurbishment works at St Philomena’s ward which is on the 1st floor level of the Hospital. The project entailed the following: Forming an opening in the existing floor to form a lift well The removal…
Details
Client: Bon Secours Health Systems Project Description: The project entailed the construction and full fit out of a 545m2 single storey extension with a 245m2 plantroom at roof level to the Radiology Dept in the Bon Secours Hospital Galway for new Interventional Cardiology and Radiology Facilities. The contract included a 37m2 single storey MV switch room…
Details
Client: HSE Dublin West Project Description: This project was undertaken in a phased manner. These phases comprised of: Demolition of the existing porto-cabins to the north of the site and removal of porto-cabins in an area of future staff accommodation phase, following decanting to newly constructed staff accommodation area. Diversion and protection of existing services in the…