MERIT MEDICAL ‘VISION’ PROJECT

Client: Merit Medical Ireland Project Description: This project entailed the construction and fit out of a new 75,000sqft Medical Device Manufacturing Facility comprising of cleanrooms, sterile preparation areas, controlled environment Research and Development facility and laboratories, together with fit out of the new European commercial HQ including integrated AV system, training and warehouse facility.  In…

St MICHAEL’S COLLEGE AILESBURY RD

Client: St Michaels College – Refurbishment & Fire Remediation Works Replacement of existing Ceiling to Assembly Hall Installation of Acoustic Wall linings Installation of new lighting layouts including design of the required electrical infrastructure Overhaul of the existing Stage Area including new access door, works to existing floor, steps, stage flats, proscenium arch and stage…

MOUNT TEMPLE COMPREHENSIVE SCHOOL

Client: Mount Temple Comprehensive School Project Description: Mount Temple Comprehensive School required emergency external Works to be undertaken during the Summer Break to be compliant with the TGD Part M – Access and Use. These Works included the construction of 3 no. external access ramps, repair and replacement of surface car parking. We successfully submitted a…

TRIBESMAN BRIDGE REPLACEMENT NUIG

Client: National University of Ireland Galway Project Description: This project entailed the removal and replacement of the existing Tribesman footbridge serving the NUIG Rowing Club. Initial enabling works included the set-up of a safe system of working to ensure that all health and safety measures were established prior to commencement of Works. This included Working…

NEW FIRE STATION TUAM CO GALWAY

Client: Galway Fire and Rescue Service, Galway Co Council Project Description: This project involved the construction of a new 2 storey Fire Station on a greenfield  site with all associated site works.  It involved the construction of a Four Appliance Bay Building with ancillary accommodation and training facilities to include a 5 storey training tower…

NEW RADIOLOGY DEPARTMENT CONNOLLY HOSPITAL DUBLIN

Client: HSE Dublin West Project Description: This project was undertaken in a phased manner. These phases comprised of: Demolition of the existing porto-cabins to the north of the site and removal of porto-cabins in an area of future staff accommodation phase, following decanting to newly constructed staff accommodation area. Diversion and protection of existing services in the…

ALLERGEN GALWAY (FORMERLY ZELTIQ)

Client: Allergen (Formerly known as Zeltiq Aesthetics) Project Description:  The project required the refurbishment and reconfiguration of an existing office space (c. 44,500sqft) to facilitate the creation of manufacturing specific areas such as a Gel production area & engineering laboratories as well as the reconfiguration of general office space and associated staff welfare facilities.  The majority of the works were carried…

CARAGH PRECISION

Client: Caragh Precision Job Description:  This project entailed the construction of a new state of the art administration and production facility for Caragh Precision on a greenfield site.  This precision engineering company manufacture specialist components for the engineering and medical device sector. Construction of the 35,000 sq.ft. facility included a specialist manufacturing area, office accommodation,…